France Evaporation has installed a turnkey type evapo-concentration unit in an ECOLAB factory
- Unit of 18m3/h of evaporation.
- Treatment capacity of 450m3/day.
Commissioning took place in the last quarter of 2021.
It is equipped with a gas boiler room, a falling film evaporator in mechanical vapor compression CMV, a forced circulation evaporator, a condensate polishing unit.
This unit makes it possible to reduce pollution in factory discharge water and is part of a project to replace a physical-chemical wastewater treatment plant.
